Emergency transmission line across the motorway 

The emergency transmission line, 3,150 metres in length, was designed and built in 28 days by OMEXOM GA Energo employees. It is a replacement for the V497 line damaged by the June tornado. The route of the damaged V497 line runs across the D2 motorway, so the construction of the emergency transmission line was carried…